Saint-Brieuc (Côtes-d’Armor)
An innovative solution to Saint-Brieuc’s drinking water challenges The existing drinking water production plant was reaching the end of its useful life and could no longer meet growing demand and regulatory requirements. This led Saint-Brieuc Armor Agglomération and SDAEP22 to commission the construction of the Croix-Cholin plant. Supplied by water from the Gouët-Saint-Barthélemy dam and […]
Saint-Brieuc (Côtes-d’Armor) Read More »